Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors

Xiangsi Lake Campus, Nanning Vocational and Technical UniversityEngineering of the Comprehensive Training Building for Industry - Education Integration (EPC)

The construction project of the integrated training building for industry - education integration in the new Xiangsi Lake campus of Nanning Vocational and Technical University requires the construction of supporting facilities.10kV power distribution facilities.


Core requirements of the project:

Urgent construction period: As stipulated in the contract,the installation of high - voltage equipment and cable testing should be completed within 15 days;

Equipment configuration: TwoZBW - 12 intelligent prefabricated substations + one outdoor switchgear cabinet;

Environmental conditions: Nanning area has a subtropical climate, and the daily average humidity≤95%.


Applied products

Outdoor switchgear cabinets, prefabricated substations

Solution
Customer Pain Points

Siwu Solution

Customer Value

1. Equipment selection


Trinity design:Integrated high-voltage cabinet (optional vacuum circuit breaker), transformer (S11 oil-immersed type), low-voltage cabinet (intelligent circuit breaker), reducing on-site assembly steps.


Environmental adaptability:

▶ Honeycomb double-layer composite shell (cold-rolled steel sheet substrate), protection level IP54;

▶ The high-voltage chamber is equipped with a temperature and humidity sensor (with the function expansion ability of "can be equipped with a distribution network automation terminal" according to the instruction manual).

Expansion compatibility:Reserved slot for distribution network automation terminal (FTU), supporting future upgrades.

Space intensification:The outdoor deployment of box-type substations eliminates the need for the construction of independent power distribution rooms.


Enhancement of intrinsic safety:

The touchable cable heads in the switchgear eliminate the risk of electric shock;

The five-prevention interlock of the KYN28 cabinet body prevents misoperation.

Optimization of operation and maintenance efficiency:

Remote monitoring of the box - transformer status reduces on - site inspections;

The handcart structure of the switchgear shortens the equipment maintenance time.


Sustainable expansion:The multi - circuit design of the switchgear station reserves the capacity for load expansion.

2. Optimization of the delivery process


Factory pre - installation and debugging:The internal wiring of the box - type substation is completed before leaving the factory to reduce on - site working hours;

Parallel construction:The equipment foundation and cable laying are advanced simultaneously.

1. The construction period is extremely short


The construction cycle of a conventional substation usually takes1 - 2 months, but the teaching schedule requires delivery within 15 days.

2. Space is limited


The equipment is placed outdoors, so outdoor compact equipment is required;

3. Environmental challenges


High - humidity environments can easily cause condensation on electrical equipment and a decrease in insulation.