Hanggang · Smart Park New Energy Charging Pile Power Distribution Project
The power distribution project of new energy charging piles in Hanggang · Smart Park is located at No. 17, Nahan Road, Jiangnan District, Nanning City. It is a key project focusing on the construction of charging infrastructure for new energy vehicles.
To meet the power distribution needs of the electric vehicle charging station in the park, the project uses the YB□ - 10.5/0.8 photovoltaic box - type substation as the core power distribution equipment to achieve efficient and stable power step - up and distribution, and support the long - term stable operation of the charging pile cluster.
Siwu Solution
Customer Value
1. The power demand of charging facilities is complex.
The load of new - energy charging stations fluctuates greatly, requiring equipment to have the ability of rapid response and multi - circuit output.
2. Strong adaptability to outdoor environments
Nanning has high temperatures and high humidity, so the equipment needs to have a high protection level and weather resistance.
3. Land occupation and construction period limitations
The park has limited space, requiring high integration of equipment, quick installation, and reduction of civil construction and commissioning time.
4.Convenience of later - stage operation and maintenance
It is required that the equipment has a low failure rate and is easy to maintain, so as to reduce the long - term operation cost.
Stable power supply: A perfect high - and low - voltage protection system and low - loss design of the transformer ensure the continuous and safe operation of the charging station.
Rapid deployment and investment savings: The complete set of equipment reduces on - site assembly steps, shortens the construction period, and lowers the comprehensive cost.
Adapt to harsh environments: High protection level (IP54 optional) and weather - resistant materials reduce the risk of failures caused by environmental factors.
Simple and efficient operation and maintenance: Modular design, flexible low - voltage outgoing lines, support rapid fault location and maintenance, and reduce long - term operational labor costs.
3. Intelligent protection and multi - circuit output:A load switch - fuse combination protection is configured on the high - voltage side. The low - voltage side supports up to 30 circuit outputs, meeting the power consumption needs of multiple charging piles simultaneously.
4. Compatibility and expandability:It supports the upgrade of distribution network automation terminals (FTU) and has the "four - remote" functions, reserving space for future smart grid transformation.
1. Integrated design:It adopts a box - type structure that combines high - voltage switches, transformers, and low - voltage switches into one, saving floor space and shortening the construction cycle.
2. High - protection and weather - resistant materials:The outer shell uses a cold - rolled plate composite structure, with a high protection level, heat insulation and moisture - proof performance, and is suitable for the rainy and humid environment in the south.
|
|