The construction project of the overall relocation (Phase II) of Du'an Yao Autonomous County People's Hospital
The construction project of the overall relocation (Phase II) of Du'an Yao Autonomous County People's Hospital is an important project to improve the local medical infrastructure level, involving key links such as the installation of electromechanical systems and fire - proof doors and windows.
This project adoptsthe EPC general contracting mode for engineering, covering the material supply and installation of high - and low - voltage power distribution systems, including 800KVA box - type substations, GCS type low - voltage draw - out switchgear, and KYN28 - 12 type armored removable AC metal - enclosed switchgear, aiming to provide stable and reliable power supply for the hospital.
Siwu Solution
Customer Value
1. AdoptKYN28 - 12 type armored removable switchgear, which has high reliability, strong insulation performance and perfect five - proof interlocking function to ensure the safety and stability of high - voltage power distribution and comply with national standards such as GB3906.
2. ConfigureSWGCS type low - voltage drawout switchgear. The modular design supports flexible expansion, which is convenient for later maintenance and adjustment to meet the low - voltage power distribution and motor control needs of the hospital.
1. Improve power supply reliability, ensure the continuous and stable operation of medical equipment, and reduce the risk of medical operation interruption caused by power problems.
2. Modular and standardized design reduces the difficulty of later operation and maintenance, shortens the fault handling time, and reduces the maintenance cost.
The device has a high protection level and strong environmental adaptability, making it suitable for the special environment of hospitals and extending its service life.
The system has good expansion capabilities, supporting the future growth of the hospital's power load or the demand for equipment expansion, thus avoiding repeated investments.
3. High stability requirements
The hospital environment has extremely high requirements for the protection level, safety performance, and long - term stability of the equipment. It is necessary to avoid power supply interruption caused by equipment failure.
3. Pass throughIntegrate high - and low - voltage power distribution units through an 800KVA box - type substation, optimize the spatial layout, reduce the on - site installation complexity, and improve the overall power supply efficiency.
4. All equipment complies with national and industry standards, has good environmental adaptability and long - term operation stability, and is suitable for hospitals24 - hour continuous power supply scenarios.
1. High requirements for power supply reliability
The hospital's power system needs to meet high - reliability requirements. Any power outage or unstable power supply may affect the normal operation of medical equipment and even endanger the safety of patients.
4. The future power load demand will increase.
The power distribution system needs to have good expandability to meet the future needs of medical equipment expansion or power load increase.
2. Traditional power distribution equipment is limited.
Traditional power distribution equipment has limitations in terms of spatial layout, operational and maintenance convenience, and intelligent management, making it difficult to meet the power consumption needs of modern hospitals.
|
|