Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors

Guangxi Luocheng Guiyouyu Technology Co., Ltd. Photovoltaic Power Generation Project (Phase I)

Guangxi Luocheng Guiyouyu Technology Co., Ltd. relies on the aquaculture industrial park and plans to build a distributed photovoltaic power generation system (Phase I) to achievethe upgrade of "fish - PV complementary" green energy. The project needs to quickly deploy a safe and reliable grid - connected hub to solve the pain points of traditional power stations, such as long construction period, large land occupation, and poor environmental adaptability.


The YB□ - 10.5/0.8 photovoltaic box - type substation is an assembly of step - up equipment specially designed for photovoltaic power generation systems. It is usually presented in the form of a box - type substation and is also known as a photovoltaic step - up box - type transformer. Its core functions include: 1. Voltage conversion: Step up the low - voltage alternating current of 800V output by the photovoltaic inverter to the medium - high voltage of 10kV to meet the grid connection requirements. 2. Power collection: Integrate the output currents of multiple photovoltaic strings and centrally distribute them to the power grid through the busbar device. 3. System protection: Integrate equipment such as circuit breakers and disconnectors to quickly isolate faults such as overload and short - circuit.

Application products

Photovoltaic grid - connected cabinet box - type substation(Customized products according to customer needs)

Solution
Customer pain points

Siwu Solution

Customer Value

1. Low construction efficiency:


The space in the breeding farm area is limited, and the construction cycle of traditional civil - engineering substations is long, which affects production and operation.

4. Sensitive to investment costs:


Hope to control the initial equipment investment and the later operation and maintenance costs.

1.Cost reduction and efficiency improvement

Integrated design reduces civil construction and installation costs, and the compressed project cycle helps to connect to the grid for power generation in advance.


2.Reliable operation


Fully - sealed transformer of the box - type substation+ Multi - layer protection structure, fearless of salt spray and humidity, reducing the failure rate.

3. Intelligent operation and maintenance


FTU remote monitoring and fault early warning to achieve "unattended operation", reducing the labor cost of inspection in the aquaculture area.

2. Weak environmental adaptability:


The high - temperature, high - humidity and salt - fog corrosion environment in Guangxi imposes strict requirements on the protection level of electrical equipment.

3. High demand for grid - connection reliability:


It is necessary to ensure continuous power supply for aquaculture loads and avoid the impact of power grid fluctuations on production equipment.

2. Intelligent integrated box-type substation


2.1 Trinity integrated design

High-voltage switchgear (vacuum circuit breaker protection),S11 low-loss transformer and low-voltage intelligent power distribution unit are pre - installed in the factory, reducing on - site commissioning time by more than 30%.


2.2 Strong environmental adaptability

Honeycomb double - layer composite board structure, taking into account both heat insulation and heat dissipation. The enclosure can be selected from stainless steel/ aluminum alloy (anti - corrosion stainless steel is used in this project) to ensure stable operation in high - temperature and high - humidity environments.

2.3 Intelligent grid - connected management


Configure distribution network automation terminals on the high - voltage side (FTU), supporting the "four - remote" functions (remote measurement, remote signaling, remote control, and remote adjustment), and real - time monitoring of short - circuit and grounding faults.

Use intelligent circuit breakers on the low - voltage side+ Automatic reactive power compensation device to ensure power quality and reduce the risk of grid fines.


2.4 Rapid and flexible deployment


The whole station is pre - fabricated for transportation. On - site, only basic positioning and cable connection are required, shortening the construction period by60% compared with traditional power stations, meeting the "zero - interference" construction requirements of farms.

1. Grid - connected cabin

As a protective enclosure, it providesIP54 - level dust and water protection, anti - corrosion (304 stainless steel material) and earthquake - resistance protection for the box - type transformer, suitable for outdoor humid environments.