Nanning Qingxiu Tesla Center Power Distribution Project
Nanning Qingxiu Tesla Center is Tesla (Tesla's core strategic site in Nanning, Guangxi, integrates sales, experience, and service functions. It is not only an important window to showcase the brand's cutting-edge technology, but also a key infrastructure to ensure worry-free electricity and excellent experience for Tesla users in the region.
To ensure the center's power supply has extremely high reliability, safety and foresight to meet the needs of its high-power super charging facilities, precision testing equipment and high-end experience areas to meet the needs of 24/7 stable operations, we customized and implemented a comprehensive electromechanical power distribution solution. This project included laying specialized cables, installing transformers, establishing a complete power distribution system consisting of low-voltage and high-voltage cabinets, and completing the infrastructure of the power distribution room.
Siwu Solution
Customer Value
1. Extremely high reliability requirements As an internationally leading new - energy vehicle brand center, any power interruption or voltage fluctuation will affect the customer experience and even the safety of vehicle charging. The power supply quality must be flawless.
1. Core high-voltage power distribution equipment
AdoptHXGN17 - 12 box-type fixed metal-enclosed switchgear. The rated voltage of this ring main unit is 12kV. It has a sturdy structure and safe and reliable operation. With its excellent insulation performance and protection ability, as the core unit for receiving and distributing electric energy, it provides a solid guarantee for the high-voltage power supply network of the entire center.
1. Guaranteeing a top-notch experience Successfully delivered a safe, stable and pure power distribution system, providing a solid foundation for the uninterrupted operation of the super charging station, high-end showroom and service center of the Tesla Center in Qingxiu, Nanning."Energy Heart".
2. Device compatibility and stability The power distribution system needs to provide a pure and stable power supply for Tesla's dedicated high - voltage fast - charging equipment and precision workshop equipment, avoiding harmonic interference and voltage sags.
2. Core low-voltage power distribution system
SelectSWGCS type low-voltage draw-out switchgear assemblies. This equipment adopts a highly modular draw-out design, supporting powerful power distribution requirements with a rated current of up to 6300A. Its features of good dynamic and thermal stability, high structural strength, and clear separation are perfectly suitable for non-linear load scenarios such as charging stations, achieving fine and reliable power distribution and centralized control.
3. Systematic professional implementation
From cable laying and transformer installation to the joint commissioning and testing of the entire high - and low - voltage system, we follow the International Electrotechnical Commission (IEC) standards and national standards (GB), strictly implement the process specifications to ensure seamless connection of all equipment and the overall efficient and stable operation of the system.
2. Meet the strict standards of high - end brands The selected equipment has mature technology and excellent performance. Its safety and reliability fully meet the infrastructure quality requirements of the Tesla brand globally.
3. Stringent safety standards The operational safety and protection level must comply with the construction specifications of international high - end brands to eliminate potential safety hazards.
4.Convenient and intelligent operation and maintenance
The equipment should be easy for daily monitoring and maintenance, with a high degree of manageability to match its modern operation and management mode.
3. Efficient operation and maintenance, creating long - term valueThe pull - out design facilitates quick maintenance and expansion, greatly reducing the difficulty and time cost of later - stage operation and maintenance, and creating long - term and stable value for customers.
4. Establish an industry benchmark The successful implementation of this project has made it a high - end commercial complex, especially a model for supporting power projects in the new energy vehicle field, which proves our ability to serve high - end customers and handle complex projects.
|
|