Star ProductsMedium and High Voltage SwitchgearLow Voltage SwitchgearSubstationsPower Distribution BoxesAuthorized CabinetsPhotovoltaic CabinetsGas-Insulated CabinetsBuswaysComprehensive Training Building (EPC) ProjectEPC Engineering of Du'an People HospitalEPC Project of Teng County Industrial Park40.008MWp Distributed Photovoltaic ProjectPower Engineering General ContractingBYD's Phase III Power Distribution ProjectNanning Qingxiu Tesla Center Power DistributionGaoshan Operation Area Power Distribution ProjectGuida Paper 35kV Substation EngineeringIron & Steel Base Power Distribution Project10kV Power Distribution Project for Cold StorageIndustryBeitou Yinshan Power Distribution ProjectPower Distribution Project of Hezhou Binfen MallLiuzhou CR Land Power Distribution ProjectGuangxi MYJ Industry Power Distribution ProjectPower Distribution Project of Creative ParkCommercial Real EstateIndustry - Education Integration Power SupplyYao Medicine Hospital Power Distribution ProjectMuseum Power Distribution ProjectSurveying & Mapping Bureau. Power Distribution ProIntegration Training Building Power DistributionGX Agricultural Vocational and Technical UniversitNanning University Training Building Power DistribGX Agricultural Engineering Vocational and TechnicPujin Road Phase II Sewage Pipe Box-type SubstatioInfrastructureBaise Sports Center Charging Piles Power DistributNapo People's Court Charging Piles Power DistributSmart Park Charging Piles Power Distribution ProjeEnergy and PowerPower Distribution Project of Nanning Rail TransitTian'e-Beihai Highway Power Distribution ProjectGuanyang - Pingle Mechanical & Electrical EngineerTransportation1.92MW Distributed Photovoltaic Power ProjectPhotovoltaic Power Generation Project (Phase I)Agriculture, Forestry, Animal Husbandry & FisheryProjects OverviewNews CenterVideo UpdatesIndustry FAQIndustry White PaperGroup ProfileIndustrial Products Platform QiansimaiHonors and QualificationsSeeking Overseas Distributors

NanningPhase II Sewage Pipe Project of Pujin RoadPower Distribution Project(People's Hospital—Chengshan Road)

The second - phase sewage pipe project of Pujin Road in Nanning is a key municipal project, which undertakes the function of sewage transportation from the People's Hospital to the Orange Mountain Road section.


The power distribution system needs to meet:

− Distributed power supply: The sewage lift pumps along the line need independent and reliable power sources;

− Outdoor environment tolerance: The equipment is exposed to a high - temperature and rainy environment (the average annual precipitation in Nanning is1300mm+);

− Space limitation: The pump station site is narrow and there is no dedicated power distribution room.


Applied products

Box - type substation


Solution
Customer Pain Points

Siwu Solution

Customer Value

1. Three - in - one intensification

− High voltage+ Transformer + Low - voltage integrated design, eliminating the need for the civil construction of an independent power distribution room;

− Occupies less space and is suitable for the narrow sites of pump stations.


2. All - environment protection

− Honeycomb - type double - layer shell (made of stainless steel): Insulates heat and moisture, with a protection level≥IP54;

− Operates in a wide temperature range from - 25℃ to + 40℃, adapting to the temperature difference between winter and summer in Nanning.

Investment cost optimization

− The integrated structure eliminates the need for the civil construction of the pump station's power distribution room.


All - climate reliability

− The stainless - steel double - layer shell blocks rainwater and moisture, ensuring continuous operation in high - humidity environments.

Long-term scalability

− Multi-circuit design supports the subsequent access of smart water management equipment.


Improvement of operation and maintenance efficiency

− Maintenance-free features reduce the frequency of inspections in road construction areas.

3. Flexible expansion ability

− 30 low-voltage outgoing circuits, supporting the access of new monitoring devices;

− Reserved automation interface: It can be equipped with a distribution network terminal (FTU) to achieve remote monitoring.


4. Maintenance-free design

− Fully sealed transformer:S11 series oil-immersed structure, no need for regular maintenance;

− Fuse linkage tripping: Automatically cut off the three-phase power supply in case of single-phase fault.

1. The cost of traditional power supply is high


− If independent power distribution rooms are built for decentralized pumping stations, the civil engineering cost will exceed the budget.


2.Insufficient environmental adaptability


− When the humidity of outdoor equipment >90%, there is a risk of insulation failure caused by condensation..

3.Lack of expansion ability


− Unable to quickly increase capacity when adding new monitoring devices (such as flow meters).

4.Poor operational and maintenance accessibility


− The pumping station is located in the road construction area, making it difficult for maintenance vehicles to enter and exit.